Archive for März, 2012

Reinforced fill slopes Avalanche Protection barrier Diasbach

Reinforced fill slopes Avalanche Protection barrier Diasbach

Kappl, Tyrol - Austria | TenCate Geosynthetics

The Diasalpe avalanche protection is one of the biggest avalanche protection wall. It’s situated at 2.200 m protecting Kappl.

» read more
Soil reinforcement – motorway

Soil reinforcement – motorway

Czech Republic | Motorway D8, section 0807/I-A | Bonar

Soil reinforcement moreover resistant against unfavourable influence chemism in soil …

» read more
Basal reinforced embankments on piles: A1/N1 dual carriage

Basal reinforced embankments on piles: A1/N1 dual carriage

A1/N1, Ireland | TenCate Geosynthetics

A section of the A1/N1 dual carriageway has been constructed and faced periodic flooding and needed a reinforcement solution …

» read more
Retaining wall – soil re reinforcing in sheer retaining wall

Retaining wall – soil re reinforcing in sheer retaining wall

Czech Republic | Jablonec na Nisou | Bonar

Soil reinforcing in sheer retaining wall – enlarging the athletic stadium …

» read more
Geogrids stabilises take-off and landing strips in Berlin

Geogrids stabilises take-off and landing strips in Berlin

Berlin-Brandenburg International Airport (BBI), Germany | NAUE GmbH & Co. KG

Geogrids for primary stabilisation on the edges of runways …

» read more
Dubai Fujairah Freeway TensarTech TW1 reinforced soil wall

Dubai Fujairah Freeway TensarTech TW1 reinforced soil wall

Dubai, United Arab Emirates | Tensar International Limited

3 Tiered Tensar reinforced soil wall – total height 60 meters …

» read more
Steep-slope retention with concrete blocks and Geogrids

Steep-slope retention with concrete blocks and Geogrids

Zarnovica, R1 Highway, Slovakia | NAUE GmbH & Co. KG

Economical, simple and efficient construction technique with a low footprint …

» read more
Whitelee wind farm

Whitelee wind farm

Scotland | Tensar International Limited

A Tensar TriAx Mechanically Stabilised Layer utilizing site-won stone to form new access roads …

» read more
Landfills – Bassins des Autizes

Landfills – Bassins des Autizes

St Pierre le Vieux & Nieul Sud (France) | TenCate Geosynthetics

Landfills area to solve the problem of pressure irrigation in the diet of the Marais Poitevin …

» read more
Maintenance facility hangar of Luxembourg airport

Maintenance facility hangar of Luxembourg airport

Luxembourg | DuPont de Nemours

DuPont™ Typar® SF geotextile installed under the basement of the new maintenance hangar and the office building to separate sandst …

» read more
Complete a Landfill Cap wit a geosynthetic drainage system

Complete a Landfill Cap wit a geosynthetic drainage system

Aemilienhausen Landfill, Germany | NAUE GmbH & Co. Kg

A geosynthetic drainage system offers a advantages as high-quality, low cost and markedly faster progress in construction …

» read more
Embankment on mining area with cavities

Embankment on mining area with cavities

European route E20, Estonia | MDB Texinov

A very high strength geotextile enables construction of a 7 km motorway section over ancient mines with risks of collapse.

» read more
Reinforced wall with strain monitoring

Reinforced wall with strain monitoring

N138 Saint Saturnin bypass, France | MDB Texinov

Geotextile reinforcement for a bridge abutment, with a fibre optics sensor-enabled geotextile …

» read more
Access road to a mine in Pilawa Górna (Poland)

Access road to a mine in Pilawa Górna (Poland)

Pilawa Górna (Poland) | TenCate Geosynthetics

The road to an Amphibolit mine in Piława Górna should cross areas of very bad soils not suitable for traffic …

» read more

Search this site